> Teesside biomass.
cheesed off
post Nov 23 2017, 08:13 PM
Joined: 30-Jan 10



Anyone know the details of the new bio mass power station getting built at Teesport. What are the weld tests and how long is the job.
Yorkshire fabbi
post Nov 26 2017, 12:49 AM
Joined: 11-May 16



Harris Pye main contractors on Teeside job local contact says long term in excess of 6months. Think I'll give it a miss with all the protests going off on my doorstep over foreign workers (King George Dock HULL).😨😵😵 open
benjam88
post Jan 20 2018, 09:48 AM
Joined: 16-Jan 10



Atlantic projects are the main contractor for the boilers. Shannan engineering are also on there doing structural stuff and I've heard a rumour that babbies have the Balance of Plant.

The test for Atlantic's was
6" p91 Tig/stick
2" p91 Tig
2" p22 Tig
2" staino Tig
3x Down hand fillets 1 Chrome Stick, 1 staino Tig and 1 chrome Tig.

Rumour has it it's going to be a 2 year job.